The Operating Model Design and Delivery Method (OMDDM) defines seven phases, from Scope to Govern, each with its own inputs, outputs and expected outcomes. A programme enters the method at whichever phase matches where its operating model change already stands.

7Phases, Scope to Govern
Entry PointAny Phase
Sector-agnosticApplies in any industry
8Existing disciplines it integrates with
The method

One method, seven phases

The OMDDM (the method) does not compress operating model change into fewer steps than it requires, and it does not add process for its own sake. Each phase is defined with its own inputs, outputs and expected outcomes, and maps directly onto one or more of the five failure modes OMDDMS® was built to address.

Where you enter the method

Not every operating model change starts from nothing. A programme that already has scope agreed and a current-state view in place enters the OMDDM at Discover or Analyse rather than repeating Scope. What the seven phases support is a flexible entry to the method, but that every phase still ahead of where the change stands gets its own inputs, outputs and expected outcomes, so nothing is skipped by assumption. A programme that enters at Design still needs Transition and Govern to follow it; treating the phases still ahead as optional is what reintroduces the failure modes the Standard was built to close.

The Standard

The seven phases

Each phase states what it establishes and the failure modes it counters. Hover over or select a tag for a summary of how the phase prevents that failure.

Scope

Resolve the operating model questions before a solution is designed

Scope defines the boundary of change and resolves the operating model questions a programme needs answered before any solution is chosen. Where Scope is skipped or rushed, the operating model is left to be decided implicitly by whatever solution gets built, which is how transformation ends up designed backwards.

Failure Mode 1: An afterthought, not the foundation How Scope counters it Scope settles the operating model questions before any solution is chosen, so the model becomes the foundation the solution is designed to fit. Without it The operating model is worked out after the solution, shaped by the technology rather than the strategy. Read about Failure Mode 1

Discover

Establish current state before any design decision is made

Discover establishes the current operating model in enough detail to be tested against the future one, including a baseline OMDDMS® Maturity Assessment: where the organisation stands today, where it needs to be, and the scale of the effort to close the gap.

Failure Mode 1: An afterthought, not the foundation How Discover counters it Discover establishes the current operating model and a baseline maturity assessment before design begins, so every decision builds on how the organisation actually works. Without it A solution is chosen with no clear view of the current model, which is then bent to fit around it. Read about Failure Mode 1

Analyse

Identify and determine the impact of proposed changes

Analyse takes the gap Discover has established and determines what a proposed change would actually do to the operating model, its capabilities, its services, and the people and decision rights that sit inside it, before that change is committed to design.

Failure Mode 3: Capability treated as a training problem How Analyse counters it Analyse traces the impact of change on capabilities, roles and decision rights, exposing structural gaps that no course can close. Without it Capability gaps surface late and are handed to a training budget. Read about Failure Mode 3

Design

Set the target model's objectives, structure and outcomes

Design specifies the target operating model in full: its organisation design, its capability and service model, its decision rights, and the principles it operates by. Structural capability gaps are identified and closed here, not left for a training programme to paper over once the model is live.

Failure Mode 2: Built for accountability, not for decisions How Design counters it Design specifies decision rights in the target model, so the authority to decide and act is designed in rather than assumed. Without it Governance names who sits on which board, not who can decide when authority is contested. Read about Failure Mode 2 Failure Mode 3: Capability treated as a training problem How Design counters it Design closes structural capability gaps through organisation design, the service model and decision rights. Without it Gaps are left for a training programme to paper over once the model is live. Read about Failure Mode 3

Transition

Manage the period when current and target models run together

Transition designs how the organisation operates while the current and target models run side by side, distinguishing governed change, made deliberately and tracked, from ungoverned change that accumulates by default. Telling people what is changing is not the same as designing how the organisation runs during the changeover.

Failure Mode 4: Transition run as a communications exercise How Transition counters it Transition designs how the organisation operates while current and target models run side by side, with change governed and tracked. Without it Transition becomes a briefing pack, and the dual-running period carries unmanaged operational risk. Read about Failure Mode 4 Failure Mode 3: Capability treated as a training problem How Transition counters it Transition sequences capability building with the changeover, so people take on new roles as the model they depend on goes live. Without it Training is scheduled at the end, disconnected from how the model is introduced. Read about Failure Mode 3

Monitor

Track performance against the design once live

Monitor tracks the operating model's performance against what Design specified, so that drift away from the target model is visible early rather than discovered retrospectively, once it has already become the organisation's new normal.

Failure Mode 5: Declared complete at go-live How Monitor counters it Monitor tracks performance against the design after go-live, so drift is visible early and corrected deliberately. Without it The model is declared complete and drifts until it no longer resembles what was designed. Read about Failure Mode 5

Govern

Give the model an owner across nine defined governance areas

Govern separates governance from management across nine defined areas of decision-making authority, not just reporting lines, and gives the operating model a named owner once it is live. Without this phase, a redesigned model is modified informally and inconsistently after go-live until it no longer resembles what was designed.

Failure Mode 2: Built for accountability, not for decisions How Govern counters it Govern separates governance from management across nine defined areas of decision-making authority. Without it Boards meet and sign off, but cannot resolve a live disagreement about direction. Read about Failure Mode 2 Failure Mode 5: Declared complete at go-live How Govern counters it Govern gives the live model a named owner and an ongoing governance function. Without it Nobody owns the model after go-live, so it is changed informally and inconsistently. Read about Failure Mode 5
Integration

How the phases integrate with what you already use

OMDDMS® was designed from the ground up to work alongside existing standards, frameworks, and methods, not replace them. The table shows how each phase maps to disciplines an organisation is likely to be running already.

Discipline OMDDM phases Standards, methods, frameworks1,2,3
Portfolio, programme and project management Scope, Discover, Analyse, Design, Transition, Monitor, Govern ISO 21500:2021, ISO 21502:2020, Project Management Institute (PMI), Association for Project Management (APM), Agile Alliance (AA), Scaled Agile Framework (SAFe®)
Business analysis Scope, Discover, Analyse, Design, Transition, Monitor, Govern ISO/IEC/IEEE 29148:2018, International Institute of Business Analysis (IIBA), British Computer Society (BCS)
Software engineering and testing Design, Transition ISO/IEC/IEEE 26514:2022, DevOps, GitOps, International Institute for Software Testing (IIST)
Service management Discover, Analyse, Design, Transition, Monitor ISO/IEC 20000-1:2018, ITIL® (Version 5)
Risk management Scope, Discover, Analyse, Design, Transition, Monitor, Govern ISO 31000:2018, International Risk Management (IRM)
Enterprise and domain architecture Scope, Discover, Analyse, Design, Transition, Monitor, Govern ISO/IEC/IEEE 42010:2022, TOGAF®, BIZBOK®
Systems and software engineering Design, Transition ISO/IEC/IEEE 12207:2017
Governance Scope, Discover, Analyse, Design, Govern ISO/IEC 38500:2024, ISO 37000:2021, COBIT® 2019

1 Sample list    2 All trademarks are the property of their respective owners and are acknowledged    3 Other standards are available from standards organisations, industry groups, and commercial organisations

In practice

What this means in practice

The seven phases are the reason OMDDMS® certification is structured the way it is, and the reason conformance to the Standard can be assessed rather than taken on trust.

For organisations

A single method spanning Scope to Govern that portfolio, architecture, risk, and governance teams all work from, instead of eight disciplines each with its own view of what "done" looks like.

For practitioners

A named phase for every stage of a programme, each with defined inputs, outputs, and expected outcomes, so a gap in the method is visible before it becomes a gap in the programme.

For boards and regulators

A way to ask which phase a struggling programme is actually in. The two failure modes boards most often miss, no named decision authority and no owner after go-live, both sit in the same phase: Govern.

Common questions

Frequently asked questions about the seven phases

Questions about the phases of the OMDDM, where to enter the method, and how it works with other frameworks.

01What are the seven phases of the OMDDM?

The Operating Model Design and Delivery Method (OMDDM) has seven phases:

  • Scope: resolve the operating model questions before a solution is designed
  • Discover: establish the current state
  • Analyse: determine the impact of proposed changes
  • Design: specify the target operating model
  • Transition: manage the period when current and target models run together
  • Monitor: track performance against the design once live
  • Govern: give the model an owner across nine defined governance areas

Each phase has its own inputs, outputs and expected outcomes.

02Do I have to start at Scope?

No. A programme enters the OMDDM at whichever phase matches where its operating model change already stands. A programme with scope agreed and a current-state view in place can enter at Discover or Analyse. Every phase still ahead of the entry point should then be applied in full, not treated as optional.

03Which failure modes does each phase counter?

Every phase counters at least one of the five failure modes:

  • Scope: Failure Mode 1, an afterthought, not the foundation
  • Discover: Failure Mode 1, an afterthought, not the foundation
  • Analyse: Failure Mode 3, capability treated as a training problem
  • Design: Failure Modes 2 and 3, built for accountability, not for decisions; capability treated as a training problem
  • Transition: Failure Modes 4 and 3, transition run as a communications exercise; capability treated as a training problem
  • Monitor: Failure Mode 5, declared complete at go-live
  • Govern: Failure Modes 2 and 5, built for accountability, not for decisions; declared complete at go-live
04Where does the OMDDMS® Maturity Assessment fit?

In Discover. A baseline OMDDMS® Maturity Assessment establishes where the organisation stands today, where it needs to be, and the scale of the effort to close the gap.

05Which phase addresses governance?

Govern. It separates governance from management across nine defined areas of decision-making authority and gives the operating model a named owner once it is live. It counters two failure modes: governance built for accountability rather than decisions, and a model declared complete at go-live.

06How do the phases work with TOGAF®, PRINCE2® or ITIL®?

The OMDDM works alongside them. Enterprise architecture (including TOGAF®) and portfolio, programme and project management (including PRINCE2® and SAFe®) map across all seven phases. Service management (including ITIL®) maps to Discover, Analyse, Design, Transition and Monitor. Organisations keep the frameworks they already use.

See the failure modes each phase prevents

Read the five failure modes in detail, or find an ATO to get certified in all seven phases.